What is the Power Cost Adjustment (PCA)?

As a not-for-profit cooperative, NOVEC does not earn a profit on electricity it purchases for delivery to customers. Instead, the actual cost of purchased power is passed through to customers without any mark-up. The PCA also includes the Halifax Biomass Facility, transmission costs, capacity, and power purchase agreements among other costs. This particular PCA also helps make up for higher costs experienced during Winter Storm Fern earlier this year.

The Co-op forecasts its energy costs and the amount of energy all of its customers will use to plan for power purchases. While those forecasts are thoroughly researched, they can sometimes differ from the actual purchased power costs as market prices fluctuate.

NOVEC is required to reconcile the difference, and the reconciliation occurs through the PCA line item on customers’ monthly bills. The PCA can be a credit or a charge. 

What is the difference between the PCA and the distribution charge?

The PCA covers the cost of purchasing electricity (including our Halifax Biomass Facility, transmission costs, capacity, and power purchase agreements, among other costs) and is passed on to members without mark-up. The distribution charge covers the cost of delivering the electricity to each individual home and business. This includes infrastructure and equipment like poles and wires, as well as labor costs for the NOVEC employees and contractors that maintain the local grid and keep the Cooperative operating efficiently and reliably. 

Where does NOVEC get its electricity from?

NOVEC is a distribution cooperative, bringing electricity from the regional transmission system to customers through our electric lines. The monthly service and distribution charges on your electric bill pay for this infrastructure.

NOVEC’s transmission provider is Dominion Energy, which has 230kV and 500kV high-voltage lines across the state; they interconnect with transmission systems in other states. While Dominion Energy owns and maintains these transmission assets, the interstate transmission system is operated by PJM Interconnection. Headquartered in Valley Forge, Pennsylvania, PJM coordinates the movement of electricity in all or parts of 13 states and the District of Columbia.

Generation of electric energy comes from nuclear, natural gas, coal, wind, and solar plants throughout PJM’s territory. PJM manages this marketplace daily, but it also keeps an eye on future generation.

How does NOVEC control its purchased power costs?

To protect against rising power costs, NOVEC locks in fixed prices and quantities for a portion of the electricity customers are forecast to use. NOVEC carefully forecasts and plans for power use. However, the power market is experiencing increasing demand at a time when supply from new generation is not keeping pace. The resulting supply and demand imbalance has led to increased market prices for electricity. 

Why is NOVEC raising rates? 

NOVEC is experiencing increasing costs associated with operating and maintaining the electric system and purchasing power. These adjustments help ensure the Cooperative can continue providing reliable service while maintaining financial responsibility for the members it serves. 

2026 Customer Notice

 

Effective November 1, 2026, NOVEC will implement an updated Power Cost Adjustment (PCA).

 

As of November 1, 2026, the PCA as it appears on customer bills will increase 1.16 cents per kWh to a charge of $0.02482 per kWh. For a residential member using an average 1,000 kWh per month, the net impact of the PCA results in an approximate $11.62 increase in the monthly bill.

As a not-for-profit electric cooperative, NOVEC does not earn a profit. Wholesale market and other costs are passed through to members without markup. Because the cost of electricity in the regional wholesale market (PJM Interconnection) is increasing, the Cooperative has modified its PCA to factor in those increased costs.  

NOVEC works hard to keep costs as low as possible for members of the Cooperative. The Co-op also works to ensure costs created by large-load customers, such as data centers, are assigned to the customers that cause them. Measures already in place include large load customers having separate rate classifications, more frequent billing cycles, and paying directly for infrastructure dedicated to them. To date, NOVEC has assigned more than $1.7 billion in infrastructure costs to data centers. Those costs are not shared with residential members.  

Also November 1, 2026, NOVEC will increase its distribution charge by 5%. Using the same 1,000 kWh per month average residential bill, that represents an increase of $1.73 for the distribution charge. The combination of both the PCA and distribution rate increase would average $13.35 for 1,000 kWh of residential use.    

NOVEC recognizes the strain any increase in costs can pose. Please visit our Ways to Save page to learn more about energy efficiency programs and audits available to our members. Additional resources are available on our NOVEC Cares page.  

Members facing financial challenges are encouraged to contact NOVEC's Customer Care center at 703-335-0500 to discuss payment plans or explore payment assistance options at www.novec.com/cares.

Facebook Icon 10_23X Icon 10_23YouTube Icon 10_23Instagram Icon 10_23LinkedIn Icon 10_23email